LMT – US NPI Program

Project Scope


  • Implement NPI & CPI Programs for LMT Model

  • Resolve Build issues in the chassis to have a proper clearance

  • Restructure the harness due to load distribution

  • Cost Analysis based on the BOM changes and design changes


Business Challenges


  • Review the feasibility for new designs and component placement

  • Concept design for platform harness connecting to radio and lights for LH

    and RH


ARi’s Solutions


  • Provided complex harness Concept Designs for 798_TL Model

  • Provided feasible routing path for harness connecting to enclosure

  • Provided common harness for tail casting as there is multiple harness,

    which reflected in cost and weight reduction

  • Rerouted stair battery cable to remove interference with the grill from stack

    up. Extra Cost Saving as change implemented without any additional

    hardware and change notice


ARi’s Value Proposition


  • Proposed common harness for tail casting as there is multiple harness,

    which reflected in cost and weight reduction. Reduce cost around 150$-

    200$ dollars

  • Concept design for platform harness connecting to radio and lights for LH

    and RH Side

  • Short delivery lead times during each build phase

  • Handle both production and prototype harnesses

  • Manufacturing of hassle-free harness kits


Download
Case Study

Download Case Study

Case Studies

Related

Prototype Built & Integrated Powerpack for Military Vehicle

2016

Cop Testing on Engines for Construction Equipment

2017

Tear Down Analysis of Construction Equipment

2019

Design and Development of Radiator Plugging Bench

2021

Scissors Lift – Software Development & Validation

2021

Unit Testing – Platform

2021

Genset Packaging

2021

Automation UDS Service Tool

2021

https://www.arigs.com/wp-content/uploads/2025/11/LMT-US-NPI-Program.pdf