Gateway

Project Scope

The Gateway project aims to enable an ECU solution that interfaces the OEM’s ECU with third-party proprietary ECUs, ensuring complete data protection throughout the process


Business Challenges

The project is highly dynamic, designed to accommodate various machine aggregates (such as engine, transmission, hydraulics, etc.) with different thirdparty ECUs. It must handle multiple variants of each machine while ensuring ontime delivery.


ARi’s Solutions


  • CAPL scripting automation and a generic gateway with Graphic User

    Interface (GUI) validation were implemented to reduce test execution time

    and enable faster software delivery

  • Documentation for Functional Safety (FuSa) compliance with ISO 26262

    was prepared in Totto to ensure adherence to safety standards


ARi’s Value Proposition


  • This is a dynamic, continuous solution provider, serving as the “go-to

    solution” for all projects across all CE machines

  • It significantly saves time in interfacing various ECUs, which in turn reduces

    costs

  • Thanks to FuSa compliance, the Bangalore ARi gateway team is attracting

    more projects from around the world


Download
Case Study

Download Case Study

Case Studies

Related

Prototype Built & Integrated Powerpack for Military Vehicle

2016

Cop Testing on Engines for Construction Equipment

2017

Tear Down Analysis of Construction Equipment

2019

Design and Development of Radiator Plugging Bench

2021

Scissors Lift – Software Development & Validation

2021

Unit Testing – Platform

2021

Genset Packaging

2021

Automation UDS Service Tool

2021

https://www.arigs.com/wp-content/uploads/2025/11/Gateway.pdf