Line Design & Optimization for Leading Fan Guard Manufacturer

Project Scope

To develop an optimized layout for fan guard manufacturing line for 2000 nos capacity.


Business Challenges


  • Simulate the process by using process analysis in PDMC software and identify the bottle neck area to create line balance in assembly line

  • Tools: PDMC


ARi’s Value Proposition


  • Validate the space requirement by animation and understand the process and material movement

  • Layout in 2D & 3D (layout will have all the machine tools boundaries, fixtures, storage racks and other equipment as applicable)

  • Material flow and assembly process in animation video

  • Line balance report


Download
Case Study

Download Case Study

Case Studies

Related

Prototype Built & Integrated Powerpack for Military Vehicle

2016

Cop Testing on Engines for Construction Equipment

2017

Tear Down Analysis of Construction Equipment

2019

Design and Development of Radiator Plugging Bench

2021

Scissors Lift – Software Development & Validation

2021

Unit Testing – Platform

2021

Genset Packaging

2021

Automation UDS Service Tool

2021

https://www.arigs.com/wp-content/uploads/2025/11/Line-Design-Optimization-for-Leading-Fan-Guard-Manufacturer.pdf