Line Design & Optimization for Leading Fan Guard Manufacturer
Home Case Studies Line Design & Optimization for Leading Fan Guard Manufacturer
Project Scope
To develop an optimized layout for fan guard manufacturing line for 2000 nos capacity.
Business Challenges
- Simulate the process by using process analysis in PDMC software and identify the bottle neck area to create line balance in assembly line
- Tools: PDMC
ARi’s Value Proposition
- Validate the space requirement by animation and understand the process and material movement
- Layout in 2D & 3D (layout will have all the machine tools boundaries, fixtures, storage racks and other equipment as applicable)
- Material flow and assembly process in animation video
- Line balance report
Download
Case Study
Case Studies
Related
https://www.arigs.com/wp-content/uploads/2025/11/Line-Design-Optimization-for-Leading-Fan-Guard-Manufacturer.pdf