Assembly line automation – Gearbox PTO Assembly
Home Case Studies Assembly line automation – Gearbox PTO Assembly
Project Scope
Develop a standalone assembly station to streamline the process of assembling a PTO pump on a gearbox. The station will assist the operator in tasks like transferring the gearbox, removing covers, applying sealant, and testing the assembled unit. Key expectations include improved ergonomics, reduced cycle time, and enhanced quality.
Business Challenges
Manual process was slow, labour-intensive, and posed ergonomic risks.
ARi’s Solutions
- Incorporated a manipulator arm for ergonomic gearbox handling and positioning
- Integrated a precision sealant dispensing system for controlled and consistent application
- Implemented a dedicated fixture for accurate PTO pump assembly and testing
- Utilized PLC and HMI for process control, data logging, and operator guidance
- Enhanced operator safety with interlocks and ergonomic workstation design
ARi’s Value Proposition
- Reduced cycle time and labour costs
- Improved ergonomics and operator safety
- Enhanced product quality and consistency
Download
Case Study
Case Studies
Related
https://www.arigs.com/wp-content/uploads/2025/08/Assembly-line-automation-–-Gearbox-PTO-Assembly.pdf